
Carefully unpack unit and properly inspect for defects before installing. Wear work gloves to prevent dirt and oil from being
transferred to the luminaire.
Choose a mounting method: chain or cable, rod mount, or pendant mount. (Chain or cable is covered here. Other options are
covered in the section Optional Mounting Methods).
1
Unit Installation
2
1
3 4
2
Loosen screws to remove power access plate.
Option 2: power input from side – Remove knockout in
endcap and A) install 1/2” conduit, or B) install AC power
cord with strain relief. Plug unused hole on power
access plate with appropriate tting
Connect the green (ground), black (line) and white
(neutral) wires of the AC line to the similarly colored
wires of the xture’s power supply using UL listed
connectors. Place all connections and exposed wire
inside of xture and reattach power access plate.
Option 1: power input from top – A) Install 1/2” conduit,
or B) install AC power cord with strain relief into power
access plate.
Electrical Connections (120/277V)
A) Conduit
A) Conduit
B) Power cord
B) Power cord
Fixture Weight
ABV1-series
LED Modules
Max. Weight (lbs.)
120/277V 347/480V
1 7 10
2 13 18
3
Chain or Cable Mounting: Please follow all UL, NEC and
minimum load rating guidelines when selecting and
installing a cable or chain.
NOTE: When selecting chain, a joint in a circular chain
link shall be welded. A joint in a chain link of another
shape shall not be located within 30 degrees of the
vertical unless welded.
Hang two chains/cables from a structural member of
the ceiling. Fixture must be supported independently
of an outlet box. Loop chain/cable through the
mounting slots next to each xture end. Chain/cable
mounting locations must be in the slots closest to the
xture end-cap.
4
Attach to
structural member
Provide at least 12” of clearance from the top of the xture to any ceiling or surface above.
Comentários a estes Manuais