GE PV977NSS Manual de Instruções Página 11

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 60
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 10
CHECK INSTALLATION HARDWARE
Locate the hardware package packed with the hood and check contents.
RECIRCULATING KIT (Included)
11
Installation Preparation
Air deflector
36" HOOD
TEMPLATE
Cut one 1/2" Dia.
Wire Access Hole
as Needed
8-1/4" To
Centerline of
Pilot Holes
8
-1
/
2
"
FRONTOFHOOD
Cut one 1/2" Dia.
Wire AccessHole
as Needed
Cut one 1/2" Dia.
Wire Access Hole
as Needed
Cut one 1/2" Dia.
Wire Access Hole
as Needed
Drill 3/16" Pilot Holes
Approx. 1-1/2" Deep
4 Places
8-1/4" To
Centerline of
Pilot Holes
10-5/16" To
Centerline of
Pilot Holes
10-5/16" To
Centerline of
Pilot Holes
31-14772
Printed in Mexico
12-08 JR
4 Wood
screws
73 Hood attachment screws
(70 required, 3 extra)
Duct covers
Charcoal filter
C
Ceiling support
Horizontal support
Upper vertical supports (4)
Lower vertical supports (4)
Duct cover supports (2)
4 Duct cover clips
Template
Stainless steel filter
D
B
E
A
A
B
C
D
E
HARDWARE PACKAGE
Locate and count screws
Upper
Lower
Vista de página 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 59 60

Comentários a estes Manuais

Sem comentários