GE PV977NSS Manual de Instruções Página 22

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 60
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 21
STEP 5 DETERMINE FRAME HEIGHT
•Measure exact
ceiling height.
Find the exact
frame height
required
on the chart
on page 12.
Use this formula
to determine
your frame
height:
A-(B+C+D) =
Frame height E where
A is the ceiling height,
B is the countertop
height, C is the height
determined by the
chart on page 12, D
is the height of the
hood measured from
the straight bottom
portion to the top
at the center.
24" Min.*
30" Max.*
36" Min.
Frame
height
2-3/8"
Ceiling
height
22
Installation Instructions
INSTALLATION—RECIRCULATING
E
A
B
D
C
STEP 6 INSTALL UPPER VERTICAL
SUPPORT
• Using the screws provided, attach the 4 upper
vertical supports to the lower vertical supports
at the position determined for frame height.
The upper vertical supports are mounted
to the outside of the lower supports.
*See Chart on page 12.
E
Vista de página 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 59 60

Comentários a estes Manuais

Sem comentários