GE PT878GC Manual do Utilizador Página 19

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 308
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 18
Initial Setup 2-1
April 2004
Chapter 2
Initial Setup
Before making measurements, you must prepare the TransPort
for operation. This includes the following procedures:
Making Electrical Connections
Charging and/or Replacing Batteries
Powering On and Off
Using the Screen and Keypad
Obtaining On-Line Help
Figure 2-1 below shows the PT878GC in its specially designed
case. The interior is molded for optimal protection of the meter
and its accessories.
Figure 2-1: The PT878GC and Accessories
Vista de página 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 307 308

Comentários a estes Manuais

Sem comentários